Assessment Year | 2007 |
---|---|
Principal Product | Fiberglass products for automotive industry |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3713: Truck and Bus Bodies |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
130,000
ft2
|
Annual Production | 16,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $415,313 | 13,997,600 |
kWh
|
$0.030 |
Electricity Demand | $267,971 | 29,280 |
kW-mo/yr
|
$9.15 |
Electricity Fees | $20,514 | - |
|
- |
Natural Gas | $301,520 | 28,194 |
MMBtu
|
$10.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,343 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,077 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1133: Adjust burners for efficient operation | $6,485 | $1,000 | - | - |
$6,485
-
MMBtu
|
|
02 | 2.2511: Insulate bare equipment | $4,588 | $7,500 | - | - |
$4,588
-
MMBtu
|
|
03 | 2.2122: Install / repair insulation on condensate lines | $473 | $438 | - | - |
$473
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $12,427 | $10,500 |
$(-148.0)
(-4,973)
kWh
|
$(-76.0)
-
kW-mo/yr
|
$12,651
-
MMBtu
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $290 | $40 |
$178
6,000
kWh
|
$112
-
kW-mo/yr
|
- | |
06 | 2.4226: Use / purchase optimum sized compressor | $7,215 | $12,000 |
$7,215
314,500
kWh
|
- | - | |
07 | 2.6218: Turn off equipment when not in use | $13,904 | - |
$8,507
286,426
kWh
|
$5,397
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,961 | $50 |
$2,424
81,600
kWh
|
$1,537
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $49,343 | $31,528 |
$18,176
683,553
kWh
|
$6,970
-
kW-mo/yr
|
$24,197
-
MMBtu
|
||
TOTAL IMPLEMENTED | $28,077 | $13,438 |
$15,722
600,926
kWh
|
$5,397
-
kW-mo/yr
|
$6,958
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs