ITAC Assessment: NC0362
ITAC logo
ITAC Assessment: NC0362
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Processed chicken
NAICS 311615: Poultry Processing
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 425
Plant Area 90,000
ft2
Annual Production 175,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $665,912 22,049,280
kWh
Electricity Demand $418,651 46,829
kW-mo/yr
Electricity Fees $32,815 -
Natural Gas $1,021,827 104,338
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $780,911 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings
01 2.2425: Use flue gases to heat process or service water $43,646 $70,525 - - $43,646
-
MMBtu
-
02 2.2425: Use flue gases to heat process or service water $75,775 $79,525 - - $75,775
-
MMBtu
-
03 2.4151: Develop a repair/replace policy $3,512 $3,546 $2,164
71,640
kWh
$1,348
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,160 $50 $1,522
50,400
kWh
$638
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $295 $537 $203
6,732
kWh
$92
-
kW-mo/yr
- -
06 3.1182: Make a new by-product $655,523 $2,000,000 - - $25,523
-
MMBtu
$630,000
-
MMBtu
TOTAL RECOMMENDED $780,911 $2,154,183 $3,889
128,772
kWh
$2,078
-
kW-mo/yr
$144,944
-
MMBtu
$630,000
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs