| Assessment Year | 1993 |
|---|---|
| Principal Product | Water Based Adhesives |
| NAICS |
n/a
|
| SIC | 2891: Adhesives and Sealants |
| Sales Range | $5 M to 10M |
| # of Employees | 19 |
| Plant Area |
26,000
ft2
|
| Annual Production | 18,000,000
pieces
|
| Production Hrs. Annual | 2,860
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $31,529 | 305,100 |
kWh
|
$0.10 |
| Natural Gas | $36,989 | 6,956 |
MMBtu
|
$5.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,077 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,034 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,748 | $4,884 |
$1,748
16,999
kWh
|
- | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $473 | - |
$473
4,689
kWh
|
- | |
| 03 | 2.7135: Install occupancy sensors | $158 | $195 |
$158
1,465
kWh
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $1,370 | $4,820 |
$1,370
13,189
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $137 | - |
$137
1,465
kWh
|
- | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,569 | $450 | - |
$1,569
-
MMBtu
|
|
| 07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,341 | $21,050 | - |
$3,341
-
MMBtu
|
|
| 08 | 2.7232: Replace existing hvac unit with high efficiency model | $281 | $9,800 |
$281
6,155
kWh
|
- | |
| TOTAL RECOMMENDED | $9,077 | $41,199 |
$4,167
43,962
kWh
|
$4,910
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,034 | $36,120 |
$2,124
24,033
kWh
|
$4,910
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs