ITAC Assessment: GT0509
ITAC logo
ITAC Assessment: GT0509
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Water Based Adhesives
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $5
M
to 10
M
# of Employees 19
Plant Area 26,000
ft2
Annual Production 18,000,000
pieces
Production Hrs. Annual 2,860
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $31,529 305,100
kWh
Natural Gas $36,989 6,956
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,077 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,034

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,748 $4,884 $1,748
16,999
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $473 - $473
4,689
kWh
-
03 2.7135: Install occupancy sensors $158 $195 $158
1,465
kWh
-
04 2.4133: Use most efficient type of electric motors $1,370 $4,820 $1,370
13,189
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $137 - $137
1,465
kWh
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $1,569 $450 - $1,569
-
MMBtu
07 2.2614: Use cooling tower or economizer to replace chiller cooling $3,341 $21,050 - $3,341
-
MMBtu
08 2.7232: Replace existing hvac unit with high efficiency model $281 $9,800 $281
6,155
kWh
-
TOTAL RECOMMENDED $9,077 $41,199 $4,167
43,962
kWh
$4,910
-
MMBtu
TOTAL IMPLEMENTED $7,034 $36,120 $2,124
24,033
kWh
$4,910
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs