ITAC Assessment: MS0343
ITAC logo
ITAC Assessment: MS0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product lumber
NAICS 321114: Wood Preservation
SIC 2491: Wood Preserving
Sales Range $50
M
to 100
M
# of Employees 50
Plant Area 300,000
ft2
Annual Production 27,000
thousand feet
Production Hrs. Annual 2,500
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,809 2,518,466
kWh
Electricity Demand $129,786 10,700
kW-mo/yr
Electricity Fees $10,403 -
Natural Gas $3,450 237
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,996 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,199

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,084 $4,017 $2,373
42,186
kWh
$2,636
-
kW-mo/yr
$75 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,954 $401 $3,894
69,234
kWh
- $60 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,621 $6,350 $1,290
22,938
kWh
$1,290
-
kW-mo/yr
$41 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,176 $4,546 $585
10,391
kWh
$574
-
kW-mo/yr
$17 -
05 2.6214: Shut off pilots in standby equipment $161 $14 - - - $161
-
MMBtu
TOTAL RECOMMENDED $12,996 $15,328 $8,142
144,749
kWh
$4,500
-
kW-mo/yr
$193 $161
-
MMBtu
TOTAL IMPLEMENTED $9,199 $4,432 $6,267
111,420
kWh
$2,636
-
kW-mo/yr
$135 $161
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs