ITAC Assessment: MZ0265
ITAC logo
ITAC Assessment: MZ0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Farming Equipment
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 349,000
ft2
Annual Production 4,800
ton
Production Hrs. Annual 2,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,405 4,088,960
kWh
Electricity Demand $363,652 17,222
kW-mo/yr
Electricity Fees $2,659 -
Natural Gas $161,380 32,835
MMBtu
TOTAL YEARLY COSTS $703,096
RECOMMENDED SAVINGS* $84,676 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $22,096 $10,000 - - $22,096 - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $20,740 $2,302 - $20,740
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $9,670 $3,552 $2,447
57,030
kWh
$7,223
-
kW-mo/yr
- - -
04 2.7135: Install occupancy sensors $5,073 $1,940 $1,926
44,894
kWh
$3,147
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,922 $1,406 $876
20,411
kWh
$2,598
-
kW-mo/yr
- - $(-552.0)
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,079 $2,052 $777
18,121
kWh
$2,302
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,033 $4,192 $765
17,822
kWh
$2,268
-
kW-mo/yr
- - -
08 2.3212: Optimize plant power factor $14,079 $20,625 - - $14,079 - -
09 2.2531: Re-size charging openings or add movable cover or door $3,984 $2,731 $(-54.0)
(-1,260)
kWh
$(-160.0)
-
kW-mo/yr
- $4,198
-
MMBtu
-
TOTAL RECOMMENDED $84,676 $48,800 $6,737
157,018
kWh
$38,118
-
kW-mo/yr
$36,175 $4,198
-
MMBtu
$(-552.0)
TOTAL IMPLEMENTED $50,282 $40,215 $4,344
101,248
kWh
$10,315
-
kW-mo/yr
$36,175 - $(-552.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs