Assessment Year | 2019 |
---|---|
Principal Product | Farming Equipment |
NAICS | 333111: Farm Machinery and Equipment Manufacturing |
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 210 |
Plant Area |
349,000
ft2
|
Annual Production | 4,800
ton
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $175,405 | 4,088,960 |
kWh
|
$0.043 |
Electricity Demand | $363,652 | 17,222 |
kW-mo/yr
|
$21.12 |
Electricity Fees | $2,659 | - |
|
- |
Natural Gas | $161,380 | 32,835 |
MMBtu
|
$4.91 |
TOTAL YEARLY COSTS | $703,096 | |||
RECOMMENDED SAVINGS* | $84,676 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,282 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $22,096 | $10,000 | - | - | $22,096 | - | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $20,740 | $2,302 | - |
$20,740
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $9,670 | $3,552 |
$2,447
57,030
kWh
|
$7,223
-
kW-mo/yr
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $5,073 | $1,940 |
$1,926
44,894
kWh
|
$3,147
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,922 | $1,406 |
$876
20,411
kWh
|
$2,598
-
kW-mo/yr
|
- | - | $(-552.0) | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,079 | $2,052 |
$777
18,121
kWh
|
$2,302
-
kW-mo/yr
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,033 | $4,192 |
$765
17,822
kWh
|
$2,268
-
kW-mo/yr
|
- | - | - | |
08 | 2.3212: Optimize plant power factor | $14,079 | $20,625 | - | - | $14,079 | - | - | |
09 | 2.2531: Re-size charging openings or add movable cover or door | $3,984 | $2,731 |
$(-54.0)
(-1,260)
kWh
|
$(-160.0)
-
kW-mo/yr
|
- |
$4,198
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $84,676 | $48,800 |
$6,737
157,018
kWh
|
$38,118
-
kW-mo/yr
|
$36,175 |
$4,198
-
MMBtu
|
$(-552.0) | ||
TOTAL IMPLEMENTED | $50,282 | $40,215 |
$4,344
101,248
kWh
|
$10,315
-
kW-mo/yr
|
$36,175 | - | $(-552.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs