ITAC Assessment: NC0360
ITAC logo
ITAC Assessment: NC0360
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Corrugated board
NAICS 322212: Folding Paperboard Box Manufacturing
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 155,000
ft2
Annual Production 480,000
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,829 4,903,920
kWh
Electricity Demand $115,267 8,660
kW-mo/yr
Electricity Fees $9,302 -
Natural Gas $518,813 50,229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,506

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $20,317 $10,000 - - $20,317
-
MMBtu
- -
02 2.2135: Repair and eliminate steam leaks $9,594 $2,250 - - $9,594
-
MMBtu
- -
03 2.7313: Recycle air for heating, ventilation and air conditioning $35,946 $33,785 - - $35,946
-
MMBtu
- -
04 2.6218: Turn off equipment when not in use $12,267 - $12,267
371,713
kWh
- - - -
05 2.4151: Develop a repair/replace policy $1,032 $662 $577
17,486
kWh
$455
-
kW-mo/yr
- - -
06 2.2437: Recover waste heat from equipment $12,731 $12,000 - - $12,731
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $836 $300 $1,293
39,174
kWh
$1,043
-
kW-mo/yr
- $(-900.0) $(-600.0)
08 2.7134: Use photocell controls $761 $750 $361
10,950
kWh
$400
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $93,484 $59,747 $14,498
439,323
kWh
$1,898
-
kW-mo/yr
$78,588
-
MMBtu
$(-900.0) $(-600.0)
TOTAL IMPLEMENTED $56,506 $25,300 $13,921
421,837
kWh
$1,443
-
kW-mo/yr
$42,642
-
MMBtu
$(-900.0) $(-600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs