Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Cases of Cigars
NAICS 312230: Tobacco Manufacturing
SIC 2120:
Sales Range $1
M
to 5
M
# of Employees 45
Plant Area 55,000
ft2
Annual Production 84,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,027 1,163,600
kWh
Electricity Demand $56,745 5,053
kW-mo/yr
Natural Gas $17,850 1,183
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,844 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,677

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $2,660 $9,688 - - $2,660
-
MMBtu
- -
02 2.7313: Recycle air for heating, ventilation and air conditioning $1,147 $2,800 - - $1,147
-
MMBtu
- -
03 2.2437: Recover waste heat from equipment $2,475 $4,243 - - $2,475
-
MMBtu
- -
04 2.6231: Utilize controls to operate equipment only when needed $885 $1,000 $885
17,530
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $484 $100 $465
9,200
kWh
$619
-
kW-mo/yr
- $(-300.0) $(-300.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,135 $1,000 $913
18,094
kWh
$1,222
-
kW-mo/yr
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $58 $39 $19
387
kWh
$39
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $9,844 $18,870 $2,282
45,211
kWh
$1,880
-
kW-mo/yr
$6,282
-
MMBtu
$(-300.0) $(-300.0)
TOTAL IMPLEMENTED $2,677 $1,139 $1,397
27,681
kWh
$1,880
-
kW-mo/yr
- $(-300.0) $(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs