| Assessment Year | 2000 |
|---|---|
| Principal Product | Brass Rod |
| NAICS |
n/a
|
| SIC | 3351: Rolling, Drawing, and Extruding Of Copper |
| Sales Range | $100 M to 500M |
| # of Employees | 240 |
| Plant Area |
250,000
ft2
|
| Annual Production | 150,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $2,544,783 | 58,480,364 |
kWh
|
$0.044 |
| Electricity Demand | $324,875 | 39,780 |
kW-mo/yr
|
$8.17 |
| Electricity Fees | $65,622 | - |
|
- |
| Natural Gas | $854,402 | 264,690 |
MMBtu
|
$3.23 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $121,212 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $62,888 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $28,712 | $84,426 |
$23,812
478,898
kWh
|
$4,900
-
kW-mo/yr
|
- | |
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,248 | - |
$1,248
36,928
kWh
|
- | - | |
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,496 | $500 |
$2,496
73,857
kWh
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,147 | $300 |
$1,665
46,893
kWh
|
$482
-
kW-mo/yr
|
- | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $2,922 | $1,500 |
$2,152
63,599
kWh
|
$770
-
kW-mo/yr
|
- | |
| 06 | 2.2511: Insulate bare equipment | $2,100 | $200 | - | - |
$2,100
-
MMBtu
|
|
| 07 | 2.2511: Insulate bare equipment | $10,078 | $10,000 | - | - |
$10,078
-
MMBtu
|
|
| 08 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $14,512 | $60,000 | - | - |
$14,512
-
MMBtu
|
|
| 09 | 2.2414: Use waste heat from hot flue gases to preheat | $56,997 | $90,000 | - | - |
$56,997
-
MMBtu
|
|
| TOTAL RECOMMENDED | $121,212 | $246,926 |
$31,373
700,175
kWh
|
$6,152
-
kW-mo/yr
|
$83,687
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $62,888 | $90,800 |
$5,409
157,678
kWh
|
$482
-
kW-mo/yr
|
$56,997
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs