ITAC Assessment: UM0163
ITAC logo
ITAC Assessment: UM0163
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Brass Rod
NAICS
n/a
SIC 3351: Rolling, Drawing, and Extruding Of Copper
Sales Range $100
M
to 500
M
# of Employees 240
Plant Area 250,000
ft2
Annual Production 150,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,544,783 58,480,364
kWh
Electricity Demand $324,875 39,780
kW-mo/yr
Electricity Fees $65,622 -
Natural Gas $854,402 264,690
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,888

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $28,712 $84,426 $23,812
478,898
kWh
$4,900
-
kW-mo/yr
-
02 2.6212: Turn off equipment during breaks, reduce operating time $1,248 - $1,248
36,928
kWh
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $2,496 $500 $2,496
73,857
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,147 $300 $1,665
46,893
kWh
$482
-
kW-mo/yr
-
05 2.4239: Eliminate or reduce compressed air usage $2,922 $1,500 $2,152
63,599
kWh
$770
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $2,100 $200 - - $2,100
-
MMBtu
07 2.2511: Insulate bare equipment $10,078 $10,000 - - $10,078
-
MMBtu
08 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $14,512 $60,000 - - $14,512
-
MMBtu
09 2.2414: Use waste heat from hot flue gases to preheat $56,997 $90,000 - - $56,997
-
MMBtu
TOTAL RECOMMENDED $121,212 $246,926 $31,373
700,175
kWh
$6,152
-
kW-mo/yr
$83,687
-
MMBtu
TOTAL IMPLEMENTED $62,888 $90,800 $5,409
157,678
kWh
$482
-
kW-mo/yr
$56,997
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs