Assessment Year | 2006 |
---|---|
Principal Product | Beer |
NAICS | 312120: Breweries |
SIC | 2082: Malt Beverages |
Sales Range | $100 M to 500M |
# of Employees | 480 |
Plant Area |
1,000,000
ft2
|
Annual Production | 175,000
Tgal
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,589,203 | 39,730,080 |
kWh
|
$0.040 |
Electricity Demand | $1,083,888 | 62,544 |
kW-mo/yr
|
$17.33 |
Natural Gas | $2,072,709 | 230,301 |
MMBtu
|
$9.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $1,394,693 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $526,208 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2425: Use flue gases to heat process or service water | $789,735 | $918,265 |
$(-14,888.0)
(-372,198)
kWh
|
$(-9,670.0)
-
kW-mo/yr
|
$814,293
-
MMBtu
|
|
02 | 2.1336: Install equipment to utilize waste fuel | $460,800 | $118,971 | - | - |
$460,800
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $48,795 | $35,000 | - | - |
$48,795
-
MMBtu
|
|
04 | 2.7263: Lower compressor pressure through a/c system modification | $62,722 | $50,000 |
$38,016
950,400
kWh
|
$24,706
-
kW-mo/yr
|
- | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $29,955 | $5,000 |
$18,240
456,000
kWh
|
$11,715
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,686 | $4,423 |
$1,659
41,472
kWh
|
$1,027
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $1,394,693 | $1,131,659 |
$43,027
1,075,674
kWh
|
$27,778
-
kW-mo/yr
|
$1,323,888
-
MMBtu
|
||
TOTAL IMPLEMENTED | $526,208 | $173,394 |
$39,675
991,872
kWh
|
$25,733
-
kW-mo/yr
|
$460,800
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs