ITAC Assessment: NC0344
ITAC logo
ITAC Assessment: NC0344
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $100
M
to 500
M
# of Employees 480
Plant Area 1,000,000
ft2
Annual Production 175,000
Tgal
Production Hrs. Annual 8,400
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,589,203 39,730,080
kWh
Electricity Demand $1,083,888 62,544
kW-mo/yr
Natural Gas $2,072,709 230,301
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,394,693 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $526,208

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2425: Use flue gases to heat process or service water $789,735 $918,265 $(-14,888.0)
(-372,198)
kWh
$(-9,670.0)
-
kW-mo/yr
$814,293
-
MMBtu
02 2.1336: Install equipment to utilize waste fuel $460,800 $118,971 - - $460,800
-
MMBtu
03 2.2437: Recover waste heat from equipment $48,795 $35,000 - - $48,795
-
MMBtu
04 2.7263: Lower compressor pressure through a/c system modification $62,722 $50,000 $38,016
950,400
kWh
$24,706
-
kW-mo/yr
-
05 2.6231: Utilize controls to operate equipment only when needed $29,955 $5,000 $18,240
456,000
kWh
$11,715
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,686 $4,423 $1,659
41,472
kWh
$1,027
-
kW-mo/yr
-
TOTAL RECOMMENDED $1,394,693 $1,131,659 $43,027
1,075,674
kWh
$27,778
-
kW-mo/yr
$1,323,888
-
MMBtu
TOTAL IMPLEMENTED $526,208 $173,394 $39,675
991,872
kWh
$25,733
-
kW-mo/yr
$460,800
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs