ITAC Assessment: NC0333
ITAC logo
ITAC Assessment: NC0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Heat Exchangers
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 100,000
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 7,500
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,150 3,607,500
kWh
Electricity Demand $65,415 7,442
kW-mo/yr
Electricity Fees $24,636 -
Natural Gas $201,348 16,147
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,721

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $25,187 $9,000 $(-3,600.0)
(-180,000)
kWh
$(-2,637.0)
-
kW-mo/yr
$31,424
-
MMBtu
- - -
02 2.2437: Recover waste heat from equipment $12,607 $4,635 - - $12,607
-
MMBtu
- - -
03 2.7311: Ventilation system to shut off when room is not in use $7,142 $1,000 - - $7,142
-
MMBtu
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,756 $50 $1,757
87,840
kWh
$1,287
-
kW-mo/yr
- - $712 -
05 2.7124: Make a practice of turning off lights when not needed $2,913 $300 $2,913
145,656
kWh
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $395 $150 $105
5,270
kWh
$78
-
kW-mo/yr
- - $212 -
07 2.4151: Develop a repair/replace policy $135 $185 $53
2,654
kWh
$82
-
kW-mo/yr
- - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $278 $100 $507
25,344
kWh
$371
-
kW-mo/yr
- $(-300.0) $(-300.0) -
09 2.7243: Improve air circulation with destratification fans / other methods $1,628 $3,000 $(-32.0)
(-1,620)
kWh
$(-48.0)
-
kW-mo/yr
$1,708
-
MMBtu
- - -
10 2.4323: Use optimum size and capacity equipment $7,550 $4,000 $28
1,400
kWh
$22
-
kW-mo/yr
- - - $7,500
TOTAL RECOMMENDED $61,591 $22,420 $1,731
86,544
kWh
$(-845.0)
-
kW-mo/yr
$52,881
-
MMBtu
$(-300.0) $624 $7,500
TOTAL IMPLEMENTED $3,721 $735 $3,578
178,924
kWh
$531
-
kW-mo/yr
- $(-300.0) $(-88.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs