ITAC Assessment: ME0142
ITAC logo
ITAC Assessment: ME0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Gerotors
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 330
Plant Area 128,000
ft2
Annual Production 216,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $425,954 4,932,005
kWh
Natural Gas $77,805 13,045
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,120 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $583

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $47,892 $56,000 $47,892
2,415,885
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $17,944 $17,480 $25,801
296,893
kWh
$(-7,857.0)
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $8,073 $3,075 $8,073
92,907
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $3,682 $250 $3,682
42,204
kWh
-
05 2.2437: Recover waste heat from equipment $6,939 $8,993 $6,939
151,817
kWh
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,604 $6,000 $3,744
43,083
kWh
$(-1,140.0)
-
MMBtu
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,307 $1,947 $3,156
36,342
kWh
$(-849.0)
-
MMBtu
08 2.4239: Eliminate or reduce compressed air usage $1,524 $675 $1,524
17,585
kWh
-
09 2.1311: Replace electrically-operated equipment with fossil fuel equipment $572 $800 $805
9,379
kWh
$(-233.0)
-
MMBtu
10 2.1233: Analyze flue gas for proper air/fuel ratio $583 $400 - $583
-
MMBtu
TOTAL RECOMMENDED $92,120 $95,620 $101,616
3,106,095
kWh
$(-9,496.0)
-
MMBtu
TOTAL IMPLEMENTED $583 $400 - $583
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs