ITAC Assessment: NC0314
ITAC logo
ITAC Assessment: NC0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Bricks
NAICS 327120: Clay Building Material and Refractories Manufacturing
SIC 3251: Brick and Structural Clay Tile
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 120,000
ft2
Annual Production 55,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,445 3,942,700
kWh
Electricity Demand $59,906 17,364
kW-mo/yr
Electricity Fees $5,696 -
Natural Gas $1,153,372 180,160
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.2511: Insulate bare equipment $8,544 $1,824 - - $8,544
-
MMBtu
- -
02 2.4151: Develop a repair/replace policy $848 $1,393 $664
15,285
kWh
$184
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,259 $379 $852
19,620
kWh
$407
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,022 $100 $1,458
33,570
kWh
$464
-
kW-mo/yr
- $(-600.0) $(-300.0)
05 2.7124: Make a practice of turning off lights when not needed $7,252 $2,552 $7,252
166,925
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,356 $660 $471
10,836
kWh
$53
-
kW-mo/yr
- $847 $(-15.0)
07 2.7142: Utilize higher efficiency lamps and/or ballasts $435 $367 $390
8,985
kWh
$45
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $20,716 $7,275 $11,087
255,221
kWh
$1,153
-
kW-mo/yr
$8,544
-
MMBtu
$247 $(-315.0)
TOTAL IMPLEMENTED $20,281 $6,908 $10,697
246,236
kWh
$1,108
-
kW-mo/yr
$8,544
-
MMBtu
$247 $(-315.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs