Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Tire molds
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 89,000
ft2
Annual Production 1,250
pieces
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,090 6,606,368
kWh
Electricity Demand $45,784 3,368
kW-mo/yr
Electricity Fees $3,000 -
Natural Gas $52,626 5,369
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,719 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,518

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $39,660 $7,500 $6,722
224,067
kWh
- $32,938
-
MMBtu
- - - -
02 2.3192: Use fossil fuel powered generator during peak demand periods $22,518 $10,000 - $27,102
-
kW-mo/yr
- $(-8,191.0)
-
MMBtu
- $3,607 -
03 2.6218: Turn off equipment when not in use $11,562 $2,000 $642
21,403
kWh
- - - $10,920 - -
04 2.7241: Install outside air damper / economizer on hvac unit $10,604 $7,125 $10,592
353,082
kWh
$12
-
kW-mo/yr
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,821 $100 $3,100
103,320
kWh
$221
-
kW-mo/yr
- - $(-1,200.0) - $(-300.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $241 $288 $222
7,410
kWh
$19
-
kW-mo/yr
- - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $234 $660 $224
7,451
kWh
$10
-
kW-mo/yr
- - - - -
08 2.7135: Install occupancy sensors $79 $293 $57
1,901
kWh
- - - - - $22
TOTAL RECOMMENDED $86,719 $27,966 $21,559
718,634
kWh
$27,364
-
kW-mo/yr
$32,938
-
MMBtu
$(-8,191.0)
-
MMBtu
$9,720 $3,607 $(-278.0)
TOTAL IMPLEMENTED $53,518 $10,548 $10,910
363,651
kWh
$250
-
kW-mo/yr
$32,938
-
MMBtu
- $9,720 - $(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs