| Assessment Year | 2004 |
|---|---|
| Principal Product | Tire molds |
| NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $10 M to 50M |
| # of Employees | 160 |
| Plant Area |
89,000
ft2
|
| Annual Production | 1,250
pieces
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $204,090 | 6,606,368 |
kWh
|
$0.031 |
| Electricity Demand | $45,784 | 3,368 |
kW-mo/yr
|
$13.59 |
| Electricity Fees | $3,000 | - |
|
- |
| Natural Gas | $52,626 | 5,369 |
MMBtu
|
$9.80 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $86,719 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $53,518 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $39,660 | $7,500 |
$6,722
224,067
kWh
|
- |
$32,938
-
MMBtu
|
- | - | - | - | |
| 02 | 2.3192: Use fossil fuel powered generator during peak demand periods | $22,518 | $10,000 | - |
$27,102
-
kW-mo/yr
|
- |
$(-8,191.0)
-
MMBtu
|
- | $3,607 | - | |
| 03 | 2.6218: Turn off equipment when not in use | $11,562 | $2,000 |
$642
21,403
kWh
|
- | - | - | $10,920 | - | - | |
| 04 | 2.7241: Install outside air damper / economizer on hvac unit | $10,604 | $7,125 |
$10,592
353,082
kWh
|
$12
-
kW-mo/yr
|
- | - | - | - | - | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,821 | $100 |
$3,100
103,320
kWh
|
$221
-
kW-mo/yr
|
- | - | $(-1,200.0) | - | $(-300.0) | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $241 | $288 |
$222
7,410
kWh
|
$19
-
kW-mo/yr
|
- | - | - | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $234 | $660 |
$224
7,451
kWh
|
$10
-
kW-mo/yr
|
- | - | - | - | - | |
| 08 | 2.7135: Install occupancy sensors | $79 | $293 |
$57
1,901
kWh
|
- | - | - | - | - | $22 | |
| TOTAL RECOMMENDED | $86,719 | $27,966 |
$21,559
718,634
kWh
|
$27,364
-
kW-mo/yr
|
$32,938
-
MMBtu
|
$(-8,191.0)
-
MMBtu
|
$9,720 | $3,607 | $(-278.0) | ||
| TOTAL IMPLEMENTED | $53,518 | $10,548 |
$10,910
363,651
kWh
|
$250
-
kW-mo/yr
|
$32,938
-
MMBtu
|
- | $9,720 | - | $(-300.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Energy Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs