ITAC Assessment: NC0289
ITAC logo
ITAC Assessment: NC0289
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Paper packaging materials
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 54,000
ft2
Annual Production 125,000
thousand feet
Production Hrs. Annual 4,800
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,114 2,325,488
kWh
Electricity Demand $60,069 6,145
kW-mo/yr
Electricity Fees $432 -
Natural Gas $3,435 328
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,873

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings
01 3.5121: Recycle waste ink and cleanup solvent $21,873 $25,000 $(-1,689.0)
(-60,318)
kWh
$(-1,438.0)
-
kW-mo/yr
$30,000
-
gal
$(-5,000.0)
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $9,527 - $(-89.0)
(-3,161)
kWh
$10,699
-
kW-mo/yr
- $(-1,083.0)
03 2.4151: Develop a repair/replace policy $230 $154 $124
4,412
kWh
$106
-
kW-mo/yr
- -
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $972 $1,000 $430
15,341
kWh
$542
-
kW-mo/yr
- -
TOTAL RECOMMENDED $32,602 $26,154 $(-1,224.0)
(-43,726)
kWh
$9,909
-
kW-mo/yr
$30,000
-
gal
$(-6,083.0)
TOTAL IMPLEMENTED $21,873 $25,000 $(-1,689.0)
(-60,318)
kWh
$(-1,438.0)
-
kW-mo/yr
$30,000
-
gal
$(-5,000.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs