| Assessment Year | 2004 |
|---|---|
| Principal Product | Paper packaging materials |
| NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
| SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
54,000
ft2
|
| Annual Production | 125,000
thousand feet
|
| Production Hrs. Annual | 4,800
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $65,114 | 2,325,488 |
kWh
|
$0.028 |
| Electricity Demand | $60,069 | 6,145 |
kW-mo/yr
|
$9.78 |
| Electricity Fees | $432 | - |
|
- |
| Natural Gas | $3,435 | 328 |
MMBtu
|
$10.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $32,602 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,873 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.5121: Recycle waste ink and cleanup solvent | $21,873 | $25,000 |
$(-1,689.0)
(-60,318)
kWh
|
$(-1,438.0)
-
kW-mo/yr
|
$30,000
-
gal
|
$(-5,000.0) | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $9,527 | - |
$(-89.0)
(-3,161)
kWh
|
$10,699
-
kW-mo/yr
|
- | $(-1,083.0) | |
| 03 | 2.4151: Develop a repair/replace policy | $230 | $154 |
$124
4,412
kWh
|
$106
-
kW-mo/yr
|
- | - | |
| 04 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $972 | $1,000 |
$430
15,341
kWh
|
$542
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $32,602 | $26,154 |
$(-1,224.0)
(-43,726)
kWh
|
$9,909
-
kW-mo/yr
|
$30,000
-
gal
|
$(-6,083.0) | ||
| TOTAL IMPLEMENTED | $21,873 | $25,000 |
$(-1,689.0)
(-60,318)
kWh
|
$(-1,438.0)
-
kW-mo/yr
|
$30,000
-
gal
|
$(-5,000.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs