ITAC Assessment: TT0170
ITAC logo
ITAC Assessment: TT0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Carpet
NAICS 314110: Carpet and Rug Mills
SIC 2273: Carpets and Rugs
Sales Range $1
M
to 5
M
# of Employees 200
Plant Area 215,000
ft2
Annual Production 800,000
units
Production Hrs. Annual 7,738
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $514,181 12,700,800
kWh
Electricity Demand $416,012 38,664
kW-mo/yr
Natural Gas $334,010 90,637
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,901 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 2.2622: Replace existing chiller with high efficiency model $13,371 $30,500 $18,994
468,977
kWh
$9,652
-
kW-mo/yr
- $(-13,675.0)
-
gal
$(-1,600.0)
02 2.2437: Recover waste heat from equipment $2,212 $1,500 - - $2,212
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,194 $3,000 $2,194
54,166
kWh
- - - -
04 2.4226: Use / purchase optimum sized compressor $1,630 $3,525 $1,630
40,238
kWh
- - - -
05 2.2511: Insulate bare equipment $1,494 $130 $1,494
36,909
kWh
- - - -
TOTAL RECOMMENDED $20,901 $38,655 $24,312
600,290
kWh
$9,652
-
kW-mo/yr
$2,212
-
MMBtu
$(-13,675.0)
-
gal
$(-1,600.0)
TOTAL IMPLEMENTED $7,530 $8,155 $5,318
131,313
kWh
- $2,212
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs