ITAC Assessment: NC0277
ITAC logo
ITAC Assessment: NC0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Clean room cleaning supplies
NAICS 325612: Polish and Other Sanitation Good Manufacturing
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 90,000
ft2
Annual Production 162,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,149 2,492,560
kWh
Electricity Demand $49,978 5,135
kW-mo/yr
Electricity Fees $3,657 -
Natural Gas $48,762 6,754
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,766 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,379

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 3.5313: Increase amount of waste recovered for resale $40,000 $1,000 - - - $40,000
02 2.4151: Develop a repair/replace policy $2,250 $710 $1,458
59,495
kWh
$792
-
kW-mo/yr
- -
03 2.7241: Install outside air damper / economizer on hvac unit $3,330 $6,680 $3,330
135,913
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $750 $782 $422
17,229
kWh
$328
-
kW-mo/yr
- -
05 2.7111: Reduce illumination to minimum necessary levels $1,387 $1,900 $781
31,860
kWh
$606
-
kW-mo/yr
- -
06 2.1133: Adjust burners for efficient operation $1,049 $1,000 - - $1,049
-
MMBtu
-
TOTAL RECOMMENDED $48,766 $12,072 $5,991
244,497
kWh
$1,726
-
kW-mo/yr
$1,049
-
MMBtu
$40,000
TOTAL IMPLEMENTED $7,379 $9,172 $5,210
212,637
kWh
$1,120
-
kW-mo/yr
$1,049
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs