ITAC Assessment: NC0268
ITAC logo
ITAC Assessment: NC0268
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Accessory products for building industry
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $50
M
to 100
M
# of Employees 290
Plant Area 450,000
ft2
Annual Production 17,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $228,091 4,716,960
kWh
Electricity Demand $55,880 11,383
kW-mo/yr
Electricity Fees $9,138 -
LPG $131,505 16,290
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,895 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 4.446: Automate finishing process $29,974 $26,350 $(-370.0)
(-8,400)
kWh
$(-256.0)
-
kW-mo/yr
- - $33,600 $(-3,000.0)
02 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $9,563 $8,000 - - $9,563
-
MMBtu
- - -
03 2.1113: Reduce combustion air flow to optimum $10,491 $2,000 - - $10,491
-
MMBtu
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $693 $500 $3,485
79,200
kWh
$808
-
kW-mo/yr
- - $(-2,400.0) $(-1,200.0)
05 2.2511: Insulate bare equipment $162 $329 - - $162
-
MMBtu
- - -
06 3.4153: Use counter current rinsing to reduce waste water $1,012 $300 - - - $1,012
-
Tgal
- -
TOTAL RECOMMENDED $51,895 $37,479 $3,115
70,800
kWh
$552
-
kW-mo/yr
$20,216
-
MMBtu
$1,012
-
Tgal
$31,200 $(-4,200.0)
TOTAL IMPLEMENTED $693 $500 $3,485
79,200
kWh
$808
-
kW-mo/yr
- - $(-2,400.0) $(-1,200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs