Assessment Year | 2003 |
---|---|
Principal Product | Bimetallic plasticating cylinders |
NAICS | 333249: Other Industrial Machinery Manufacturing |
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 72 |
Plant Area |
40,000
ft2
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,588 | 1,700,600 |
kWh
|
$0.030 |
Electricity Demand | $35,416 | 5,750 |
kW-mo/yr
|
$6.16 |
Electricity Fees | $5,870 | - |
|
- |
Natural Gas | $54,154 | 8,677 |
MMBtu
|
$6.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,459 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $10,471 | $10,000 | - | - |
$10,471
-
MMBtu
|
- | |
02 | 2.1321: Replace fossil fuel equipment with electrical equipment | $33,773 | $55,000 |
$(-4,812.0)
(-161,750)
kWh
|
$(-4,783.0)
-
kW-mo/yr
|
$43,368
-
MMBtu
|
- | |
03 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $4,320 | $5,653 |
$1,152
38,711
kWh
|
- |
$4,573
-
MMBtu
|
$(-1,405.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,339 | $50 |
$714
24,000
kWh
|
$295
-
kW-mo/yr
|
- | $2,330 | |
05 | 2.4226: Use / purchase optimum sized compressor | $2,272 | $5,225 |
$1,607
54,000
kWh
|
$665
-
kW-mo/yr
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $1,284 | $800 | - | - |
$1,284
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $55,459 | $76,728 |
$(-1,339.0)
(-45,039)
kWh
|
$(-3,823.0)
-
kW-mo/yr
|
$59,696
-
MMBtu
|
$925 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs