ITAC Assessment: NC0250
ITAC logo
ITAC Assessment: NC0250
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Lockers, shelving, and racks
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 483,000
ft2
Annual Production 33,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,908 5,533,486
kWh
Electricity Demand $186,471 12,693
kW-mo/yr
Electricity Fees $38,225 -
Natural Gas $290,782 49,616
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $155,689 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,251

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 2.3113: Make ice during off peak hours for cooling $13,524 $16,000 n/a $(-374.0)
(-30,511)
kWh
$13,898
-
kW-mo/yr
- - -
02 2.1113: Reduce combustion air flow to optimum $37,000 $12,000 n/a - - $37,000
-
MMBtu
- -
03 2.2437: Recover waste heat from equipment $11,259 $20,000 $(-583.0)
(-24,513)
kWh
$(-1,044.0)
-
kW-mo/yr
$12,886
-
MMBtu
- -
04 2.2437: Recover waste heat from equipment $12,244 $12,245 $(-391.0)
(-16,432)
kWh
$(-702.0)
-
kW-mo/yr
$13,337
-
MMBtu
- -
05 2.7229: Air condition only space necessary $65,851 $10,750 $922
38,737
kWh
$5,929
-
kW-mo/yr
- $59,000 -
06 4.651: Install back-up equipment $13,440 $35,000 - - - - $13,440
07 2.4151: Develop a repair/replace policy $798 $1,293 $285
11,961
kWh
$513
-
kW-mo/yr
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $322 $921 $146
6,153
kWh
$176
-
kW-mo/yr
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,251 $420 $447
18,786
kWh
$804
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $155,689 $108,629 $452
4,181
kWh
$19,574
-
kW-mo/yr
$63,223
-
MMBtu
$59,000 $13,440
TOTAL IMPLEMENTED $1,251 $420 $447
18,786
kWh
$804
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs