| Assessment Year | 2002 |
|---|---|
| Principal Product | Frames |
| NAICS |
n/a
|
| SIC | 2426: Hardwood Dimension and Flooring Mills |
| Sales Range | $5 M to 10M |
| # of Employees | 70 |
| Plant Area |
90,000
ft2
|
| Annual Production | 10,000
thousand feet
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $91,729 | 1,498,800 |
kWh
|
$0.061 |
| Electricity Demand | $30,909 | 4,755 |
kW-mo/yr
|
$6.50 |
| Electricity Fees | $4,111 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $63,232 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $52,630 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3192: Use fossil fuel powered generator during peak demand periods | $44,473 | $120,000 | - |
$16,068
-
kW-mo/yr
|
$28,405 | |
| 02 | 2.7145: Install skylights | $1,646 | $540 |
$1,646
26,980
kWh
|
- | - | |
| 03 | 2.7111: Reduce illumination to minimum necessary levels | $2,600 | $2,665 |
$2,070
33,942
kWh
|
$530
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $591 | $1,597 |
$364
5,966
kWh
|
$227
-
kW-mo/yr
|
- | |
| 05 | 2.4323: Use optimum size and capacity equipment | $10,011 | $7,795 |
$10,011
164,120
kWh
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $427 | $100 |
$324
5,304
kWh
|
$103
-
kW-mo/yr
|
- | |
| 07 | 2.4151: Develop a repair/replace policy | $774 | $863 |
$563
9,233
kWh
|
$211
-
kW-mo/yr
|
- | |
| 08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,850 | $1,004 |
$1,402
22,982
kWh
|
$448
-
kW-mo/yr
|
- | |
| 09 | 2.6218: Turn off equipment when not in use | $860 | $500 |
$860
14,093
kWh
|
- | - | |
| TOTAL RECOMMENDED | $63,232 | $135,064 |
$17,240
282,620
kWh
|
$17,587
-
kW-mo/yr
|
$28,405 | ||
| TOTAL IMPLEMENTED | $52,630 | $125,672 |
$6,865
112,534
kWh
|
$17,360
-
kW-mo/yr
|
$28,405 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs