Assessment Year | 2002 |
---|---|
Principal Product | Ladies hosiery |
NAICS |
n/a
|
SIC | 2252: Hosiery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 439 |
Plant Area |
160,000
ft2
|
Annual Production | 29,448,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $476,809 | 13,862,400 |
kWh
|
$0.034 |
Electricity Demand | $378,515 | 33,646 |
kW-mo/yr
|
$11.25 |
Electricity Fees | $31,983 | - |
|
- |
Natural Gas | $374,891 | 80,974 |
MMBtu
|
$4.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,539 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,167 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1133: Adjust burners for efficient operation | $10,271 | $1,000 | - | - |
$10,271
-
MMBtu
|
- | |
02 | 2.2127: Flash condensate to produce lower pressure steam | $9,455 | $10,000 | - | - |
$8,781
-
MMBtu
|
$674
-
Tgal
|
|
03 | 3.4113: Treat and reuse rinse waters | $28,786 | $5,000 | - | - |
$21,802
-
MMBtu
|
$6,984
-
Tgal
|
|
04 | 2.2511: Insulate bare equipment | $6,131 | $10,062 | - | - |
$6,131
-
MMBtu
|
- | |
05 | 2.4151: Develop a repair/replace policy | $547 | $369 |
$339
9,690
kWh
|
$208
-
kW-mo/yr
|
- | - | |
06 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $2,368 | $1,200 |
$1,335
38,175
kWh
|
$1,033
-
kW-mo/yr
|
- | - | |
07 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $5,981 | $3,100 |
$1,356
38,780
kWh
|
$4,625
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $63,539 | $30,731 |
$3,030
86,645
kWh
|
$5,866
-
kW-mo/yr
|
$46,985
-
MMBtu
|
$7,658
-
Tgal
|
||
TOTAL IMPLEMENTED | $19,167 | $5,669 |
$3,030
86,645
kWh
|
$5,866
-
kW-mo/yr
|
$10,271
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs