ITAC Assessment: NC0241
ITAC logo
ITAC Assessment: NC0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Forged and cast metal parts
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 280,000
ft2
Annual Production 17,662,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $884,264 26,894,911
kWh
Electricity Demand $309,804 14,865
kW-mo/yr
Electricity Fees $49,740 -
Natural Gas $745,180 92,623
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,715 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7313: Recycle air for heating, ventilation and air conditioning $6,456 $8,000 - - $6,456
-
MMBtu
02 2.7241: Install outside air damper / economizer on hvac unit $1,506 $6,000 $1,506
45,770
kWh
- -
03 2.4151: Develop a repair/replace policy $4,751 $6,493 $2,354
71,541
kWh
$2,397
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $503 $576 $249
7,569
kWh
$254
-
kW-mo/yr
-
05 2.1232: Keep boiler tubes clean $499 $1,600 $499
62
kWh
- -
TOTAL RECOMMENDED $13,715 $22,669 $4,608
124,942
kWh
$2,651
-
kW-mo/yr
$6,456
-
MMBtu
TOTAL IMPLEMENTED $11,706 $16,093 $2,853
71,603
kWh
$2,397
-
kW-mo/yr
$6,456
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs