Assessment Year | 2012 |
---|---|
Principal Product | Agricultural Equipment |
NAICS | 333111: Farm Machinery and Equipment Manufacturing |
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
250,000
ft2
|
Annual Production | 12,500,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,170 | 4,151,496 |
kWh
|
$0.034 |
Electricity Demand | $40,455 | 13,100 |
kW-mo/yr
|
$3.09 |
Natural Gas | $86,848 | 18,418 |
MMBtu
|
$4.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,627 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,119 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,612 | $72,410 |
$13,856
405,200
kWh
|
$3,756
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,511 | $19,201 |
$5,910
172,800
kWh
|
$1,601
-
kW-mo/yr
|
|
03 | 2.7135: Install occupancy sensors | $3,110 | $6,400 |
$3,110
90,961
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $856 | $331 |
$760
22,102
kWh
|
$96
-
kW-mo/yr
|
|
05 | 2.4239: Eliminate or reduce compressed air usage | $398 | $250 |
$398
11,641
kWh
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $2,490 | $6,000 |
$2,490
72,768
kWh
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,650 | $35 |
$1,465
42,840
kWh
|
$185
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $33,627 | $104,627 |
$27,989
818,312
kWh
|
$5,638
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $30,119 | $97,977 |
$24,481
715,710
kWh
|
$5,638
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs