ITAC Assessment: NC0240
ITAC logo
ITAC Assessment: NC0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Case good furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 220,000
ft2
Annual Production 14,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,291 4,623,680
kWh
Electricity Demand $75,600 21,600
kW-mo/yr
Electricity Fees $12,436 -
Fuel Oil #2 $8,000 1,400
MMBtu
Coal $2,700 1,246
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $116,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $116,127

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Fuel Oil #4 Savings Primary Product Savings
01 2.1232: Keep boiler tubes clean $12,204 $10,000 - - $8,000
-
MMBtu
$4,204
-
MMBtu
-
02 2.4151: Develop a repair/replace policy $673 $1,146 $447
10,741
kWh
$226
-
kW-mo/yr
- - -
03 2.7134: Use photocell controls $118 $200 $96
2,300
kWh
$22
-
kW-mo/yr
- - -
04 2.4239: Eliminate or reduce compressed air usage $132 $60 $88
2,112
kWh
$44
-
kW-mo/yr
- - -
05 2.8118: Check for accuracy of utility / power meters $3,000 $1,000 $1,923
46,224
kWh
$756
-
kW-mo/yr
$321
-
MMBtu
- -
06 4.711: Initiate a total quality management program $100,000 $200,000 - - - - $100,000
TOTAL RECOMMENDED $116,127 $212,406 $2,554
61,377
kWh
$1,048
-
kW-mo/yr
$8,321
-
MMBtu
$4,204
-
MMBtu
$100,000
TOTAL IMPLEMENTED $116,127 $212,406 $2,554
61,377
kWh
$1,048
-
kW-mo/yr
$8,321
-
MMBtu
$4,204
-
MMBtu
$100,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Fuel Oil #4 Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs