ITAC Assessment: NC0236
ITAC logo
ITAC Assessment: NC0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 95
Plant Area 150,000
ft2
Annual Production 70,000
thousand feet
Production Hrs. Annual 2,000
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $389,985 7,308,573
kWh
Electricity Demand $160,196 33,584
kW-mo/yr
Electricity Fees $14,781 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,824 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,534

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Primary Raw Material Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $1,684 $6,000 $2,185
41,950
kWh
$938
-
kW-mo/yr
$(-1,439.0)
-
Tgal
- -
02 2.4151: Develop a repair/replace policy $4,419 $8,200 $2,876
53,903
kWh
$1,543
-
kW-mo/yr
- - -
03 3.1191: Change procedures / equipment / operating conditions $19,606 $550 - - - $(-3,750.0) $23,356
04 2.7134: Use photocell controls $115 $260 $75
1,400
kWh
$40
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $25,824 $15,010 $5,136
97,253
kWh
$2,521
-
kW-mo/yr
$(-1,439.0)
-
Tgal
$(-3,750.0) $23,356
TOTAL IMPLEMENTED $4,534 $8,460 $2,951
55,303
kWh
$1,583
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs