ITAC Assessment: NC0213
ITAC logo
ITAC Assessment: NC0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Feldspar
NAICS
n/a
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 31
Plant Area 50,000
ft2
Annual Production 440,000,000
lb
Production Hrs. Annual 8,600
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $387,604 9,590,208
kWh
Electricity Demand $139,948 17,773
kW-mo/yr
Fuel Oil #4 $301,000 95,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $169,776 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $111,660

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $272 $450 $214
5,307
kWh
$58
-
kW-mo/yr
- -
02 2.4154: Avoid rewinding motors more than twice $8,087 $6,437 $6,362
157,487
kWh
$1,725
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,084 $1,559 $3,213
79,530
kWh
$871
-
kW-mo/yr
- -
04 2.2414: Use waste heat from hot flue gases to preheat $44,656 $40,000 - - $44,656
-
MMBtu
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,013 $35,000 $15,209
376,450
kWh
$4,286
-
kW-mo/yr
$(-5,482.0)
-
MMBtu
$(-1,000.0)
06 2.2511: Insulate bare equipment $9,104 $17,000 - - $9,104
-
MMBtu
-
07 2.8114: Change rate schedules or other changes in utility service $90,560 $35,000 - $90,560
-
kW-mo/yr
- -
TOTAL RECOMMENDED $169,776 $135,446 $24,998
618,774
kWh
$97,500
-
kW-mo/yr
$48,278
-
MMBtu
$(-1,000.0)
TOTAL IMPLEMENTED $111,660 $76,437 $21,571
533,937
kWh
$96,571
-
kW-mo/yr
$(-5,482.0)
-
MMBtu
$(-1,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #4 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs