ITAC Assessment: NC0199
ITAC logo
ITAC Assessment: NC0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Engine starters, hoists, air tools
NAICS
n/a
SIC 3546: Power-Driven Handtools
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 100,000
ft2
Annual Production 60,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $338,487 7,185,522
kWh
Electricity Demand $89,692 18,342
kW-mo/yr
Natural Gas $35,344 7,230
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,524 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,866

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.7245: Use direct air supply to exhaust hoods $1,845 $777 $713
15,240
kWh
- $1,132
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,374 $7,490 $1,966
41,618
kWh
$408
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $1,516 $1,070 - - $1,516
-
MMBtu
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $351 $102 $216
4,689
kWh
$135
-
kW-mo/yr
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,352 $210 $1,119
23,740
kWh
$233
-
kW-mo/yr
- - -
06 2.4222: Install adequate dryers on air lines to eliminate blowdown $5,140 - $221
4,689
kWh
$419
-
kW-mo/yr
- - $4,500
07 2.4225: Install common header on compressors $26,946 $118,000 $5,513
116,940
kWh
$3,433
-
kW-mo/yr
- $18,000 -
TOTAL RECOMMENDED $39,524 $127,649 $9,748
206,916
kWh
$4,628
-
kW-mo/yr
$2,648
-
MMBtu
$18,000 $4,500
TOTAL IMPLEMENTED $8,866 $7,700 $3,306
70,047
kWh
$1,060
-
kW-mo/yr
- - $4,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs