Assessment Year | 2000 |
---|---|
Principal Product | Engine starters, hoists, air tools |
NAICS |
n/a
|
SIC | 3546: Power-Driven Handtools |
Sales Range | $50 M to 100M |
# of Employees | 220 |
Plant Area |
100,000
ft2
|
Annual Production | 60,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $338,487 | 7,185,522 |
kWh
|
$0.047 |
Electricity Demand | $89,692 | 18,342 |
kW-mo/yr
|
$4.89 |
Natural Gas | $35,344 | 7,230 |
MMBtu
|
$4.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,524 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,866 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7245: Use direct air supply to exhaust hoods | $1,845 | $777 |
$713
15,240
kWh
|
- |
$1,132
-
MMBtu
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,374 | $7,490 |
$1,966
41,618
kWh
|
$408
-
kW-mo/yr
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $1,516 | $1,070 | - | - |
$1,516
-
MMBtu
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $351 | $102 |
$216
4,689
kWh
|
$135
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,352 | $210 |
$1,119
23,740
kWh
|
$233
-
kW-mo/yr
|
- | - | - | |
06 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $5,140 | - |
$221
4,689
kWh
|
$419
-
kW-mo/yr
|
- | - | $4,500 | |
07 | 2.4225: Install common header on compressors | $26,946 | $118,000 |
$5,513
116,940
kWh
|
$3,433
-
kW-mo/yr
|
- | $18,000 | - | |
TOTAL RECOMMENDED | $39,524 | $127,649 |
$9,748
206,916
kWh
|
$4,628
-
kW-mo/yr
|
$2,648
-
MMBtu
|
$18,000 | $4,500 | ||
TOTAL IMPLEMENTED | $8,866 | $7,700 |
$3,306
70,047
kWh
|
$1,060
-
kW-mo/yr
|
- | - | $4,500 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs