ITAC Assessment: NC0198
ITAC logo
ITAC Assessment: NC0198
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Grounding rods
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 225,000
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $662,449 22,570,047
kWh
Electricity Demand $328,104 39,435
kW-mo/yr
Electricity Fees $4,803 -
Natural Gas $49,378 7,813
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $64,814 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,557

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,448 $300 $1,749
60,375
kWh
$699
-
kW-mo/yr
- -
02 2.4226: Use / purchase optimum sized compressor $9,807 $18,000 $6,907
238,277
kWh
$2,900
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $19,308 $41,718 - - - $19,308
-
MMBtu
04 2.3132: Recharge batteries on during off-peak demand periods $4,264 - - $3,448
-
kW-mo/yr
$816 -
05 2.2437: Recover waste heat from equipment $1,845 $820 - - - $1,845
-
MMBtu
06 2.9112: Use solar heat to heat water $27,142 $97,350 $12,338
425,557
kWh
$14,804
-
kW-mo/yr
- -
TOTAL RECOMMENDED $64,814 $158,188 $20,994
724,209
kWh
$21,851
-
kW-mo/yr
$816 $21,153
-
MMBtu
TOTAL IMPLEMENTED $8,557 $1,120 $1,749
60,375
kWh
$4,147
-
kW-mo/yr
$816 $1,845
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs