Assessment Year | 2000 |
---|---|
Principal Product | Grounding rods |
NAICS |
n/a
|
SIC | 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
225,000
ft2
|
Annual Production | 6,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $662,449 | 22,570,047 |
kWh
|
$0.029 |
Electricity Demand | $328,104 | 39,435 |
kW-mo/yr
|
$8.32 |
Electricity Fees | $4,803 | - |
|
- |
Natural Gas | $49,378 | 7,813 |
MMBtu
|
$6.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $64,814 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,557 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,448 | $300 |
$1,749
60,375
kWh
|
$699
-
kW-mo/yr
|
- | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $9,807 | $18,000 |
$6,907
238,277
kWh
|
$2,900
-
kW-mo/yr
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $19,308 | $41,718 | - | - | - |
$19,308
-
MMBtu
|
|
04 | 2.3132: Recharge batteries on during off-peak demand periods | $4,264 | - | - |
$3,448
-
kW-mo/yr
|
$816 | - | |
05 | 2.2437: Recover waste heat from equipment | $1,845 | $820 | - | - | - |
$1,845
-
MMBtu
|
|
06 | 2.9112: Use solar heat to heat water | $27,142 | $97,350 |
$12,338
425,557
kWh
|
$14,804
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $64,814 | $158,188 |
$20,994
724,209
kWh
|
$21,851
-
kW-mo/yr
|
$816 |
$21,153
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,557 | $1,120 |
$1,749
60,375
kWh
|
$4,147
-
kW-mo/yr
|
$816 |
$1,845
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs