ITAC Assessment: NC0194
ITAC logo
ITAC Assessment: NC0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Strain gages
NAICS
n/a
SIC 3829: Measuring and Controlling Devices, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 396
Plant Area 200,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,304 5,037,808
kWh
Electricity Demand $132,084 16,074
kW-mo/yr
Electricity Fees $9,385 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,279

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.2491: Use cooling air which cools hot work pieces for space heating $429 $835 $429
13,775
kWh
- - - -
02 2.7145: Install skylights $3,443 $7,000 $1,335
42,790
kWh
$2,108
-
kW-mo/yr
- - -
03 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system $13,561 $29,000 $3,486
111,665
kWh
$14,922
-
kW-mo/yr
$(-4,847.0)
-
Tgal
- -
04 3.5313: Increase amount of waste recovered for resale $483 $400 - - - $483
-
lb
-
05 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $29,846 $20,200 $(-824.0)
(-26,377)
kWh
$(-867.0)
-
kW-mo/yr
$24,204
-
Tgal
- $7,333
TOTAL RECOMMENDED $47,762 $57,435 $4,426
141,853
kWh
$16,163
-
kW-mo/yr
$19,357
-
Tgal
$483
-
lb
$7,333
TOTAL IMPLEMENTED $47,279 $57,035 $4,426
141,853
kWh
$16,163
-
kW-mo/yr
$19,357
-
Tgal
- $7,333
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs