Assessment Year | 2000 |
---|---|
Principal Product | Strain gages |
NAICS |
n/a
|
SIC | 3829: Measuring and Controlling Devices, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 396 |
Plant Area |
200,000
ft2
|
Annual Production | 50,000,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $157,304 | 5,037,808 |
kWh
|
$0.031 |
Electricity Demand | $132,084 | 16,074 |
kW-mo/yr
|
$8.22 |
Electricity Fees | $9,385 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $47,762 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,279 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2491: Use cooling air which cools hot work pieces for space heating | $429 | $835 |
$429
13,775
kWh
|
- | - | - | - | |
02 | 2.7145: Install skylights | $3,443 | $7,000 |
$1,335
42,790
kWh
|
$2,108
-
kW-mo/yr
|
- | - | - | |
03 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $13,561 | $29,000 |
$3,486
111,665
kWh
|
$14,922
-
kW-mo/yr
|
$(-4,847.0)
-
Tgal
|
- | - | |
04 | 3.5313: Increase amount of waste recovered for resale | $483 | $400 | - | - | - |
$483
-
lb
|
- | |
05 | 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water | $29,846 | $20,200 |
$(-824.0)
(-26,377)
kWh
|
$(-867.0)
-
kW-mo/yr
|
$24,204
-
Tgal
|
- | $7,333 | |
TOTAL RECOMMENDED | $47,762 | $57,435 |
$4,426
141,853
kWh
|
$16,163
-
kW-mo/yr
|
$19,357
-
Tgal
|
$483
-
lb
|
$7,333 | ||
TOTAL IMPLEMENTED | $47,279 | $57,035 |
$4,426
141,853
kWh
|
$16,163
-
kW-mo/yr
|
$19,357
-
Tgal
|
- | $7,333 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs