ITAC Assessment: NC0193
ITAC logo
ITAC Assessment: NC0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Plastic bottles
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 160,000
ft2
Annual Production 400,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $418,804 16,614,596
kWh
Electricity Demand $274,478 29,060
kW-mo/yr
Electricity Fees $23,191 -
Natural Gas $8,969 1,388
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,989 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $762 $3,710 $373
14,654
kWh
$389
-
kW-mo/yr
- -
02 2.4151: Develop a repair/replace policy $3,831 $3,617 $2,537
100,821
kWh
$1,294
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,422 $56 $941
37,222
kWh
$481
-
kW-mo/yr
- -
04 2.7111: Reduce illumination to minimum necessary levels $1,211 $3,850 $430
16,999
kWh
$781
-
kW-mo/yr
- -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $35,491 $500 $6,893
214,537
kWh
$11,078
-
kW-mo/yr
$17,520 -
06 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $64,272 $64,142 $42,506
1,687,280
kWh
$21,766
-
kW-mo/yr
- -
07 4.322: Eliminate old stock and modify inventory control $23,000 $1,000 - - $15,000 $8,000
TOTAL RECOMMENDED $129,989 $76,875 $53,680
2,071,513
kWh
$35,789
-
kW-mo/yr
$32,520 $8,000
TOTAL IMPLEMENTED $3,831 $3,617 $2,537
100,821
kWh
$1,294
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs