ITAC Assessment: MS0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Conveyor Systems
NAICS
n/a
SIC 3535: Conveyors and Conveying Equipment
Sales Range $50
M
to 100
M
# of Employees 380
Plant Area 304,000
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $243,110 7,837,339
kWh
Electricity Demand $160,954 17,794
kW-mo/yr
Electricity Fees $6,165 -
Natural Gas $142,844 48,497
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,155 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,037

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7124: Make a practice of turning off lights when not needed $4,514 $4,620 $4,514
145,662
kWh
- - - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $16,653 $30,962 $9,869
317,995
kWh
$6,784
-
kW-mo/yr
- - - - -
03 2.7134: Use photocell controls $1,556 $616 $1,556
50,117
kWh
- - - - - -
04 2.4221: Install compressor air intakes in coolest locations $1,390 $541 $962
31,067
kWh
$428
-
kW-mo/yr
- - - - -
05 2.2443: Re-use or recycle hot or cold process exhaust air $9,480 $955 - - $9,480
-
MMBtu
- - - -
06 3.5316: Contract a wood pallet recycling company $8,888 - - - - - $8,888
-
lb
- -
07 3.8141: Regenerate cleaning solvent on-site and reuse $12,074 $13,000 - - - $2,189
-
gal
- - $9,885
08 4.452: Eliminate shift $81,600 - - - - - - $81,600 -
TOTAL RECOMMENDED $136,155 $50,694 $16,901
544,841
kWh
$7,212
-
kW-mo/yr
$9,480
-
MMBtu
$2,189
-
gal
$8,888
-
lb
$81,600 $9,885
TOTAL IMPLEMENTED $32,037 $37,078 $15,345
494,724
kWh
$7,212
-
kW-mo/yr
$9,480
-
MMBtu
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs