ITAC Assessment: NC0191
ITAC logo
ITAC Assessment: NC0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Door sills
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 350,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,110 4,346,424
kWh
Electricity Demand $64,675 11,378
kW-mo/yr
Electricity Fees $8,168 -
Natural Gas $33,555 4,859
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,848

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 2.2437: Recover waste heat from equipment $1,005 $1,000 - - $1,005
-
MMBtu
- - -
02 2.4133: Use most efficient type of electric motors $1,096 $1,753 $395
12,309
kWh
$701
-
kW-mo/yr
- - - -
03 2.2511: Insulate bare equipment $545 $1,050 - - $545
-
MMBtu
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $593 - $236
5,275
kWh
$357
-
kW-mo/yr
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $701 - $441
13,775
kWh
$260
-
kW-mo/yr
- - - -
06 2.4323: Use optimum size and capacity equipment $29,945 $40,000 $6,170
192,849
kWh
$10,966
-
kW-mo/yr
$12,809
-
MMBtu
- - -
07 2.4226: Use / purchase optimum sized compressor $1,556 $1,000 $1,040
22,567
kWh
$516
-
kW-mo/yr
- - - -
08 4.453: Reschedule breaks to allow for continuous production $6,729 $288 - - - $(-3,167.0) $6,563 $3,333
TOTAL RECOMMENDED $42,170 $45,091 $8,282
246,775
kWh
$12,800
-
kW-mo/yr
$14,359
-
MMBtu
$(-3,167.0) $6,563 $3,333
TOTAL IMPLEMENTED $34,848 $44,803 $8,046
241,500
kWh
$12,443
-
kW-mo/yr
$14,359
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs