ITAC Assessment: NC0180
ITAC logo
ITAC Assessment: NC0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Processed meat
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 675
Plant Area 300,000
ft2
Annual Production 33,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $432,011 18,788,687
kWh
Electricity Demand $687,791 44,413
kW-mo/yr
Electricity Fees $7,184 -
Natural Gas $322,073 88,339
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $93,494 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $93,306

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.1133: Adjust burners for efficient operation $8,324 $2,000 - - $8,324
-
MMBtu
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,282 $1,500 $2,705
117,526
kWh
$2,577
-
kW-mo/yr
- - - -
03 2.2437: Recover waste heat from equipment $15,440 $53,360 - - $15,440
-
MMBtu
- - -
04 2.4226: Use / purchase optimum sized compressor $1,175 $3,250 - - $1,175
-
MMBtu
- - -
05 3.5313: Increase amount of waste recovered for resale $188 $300 - - - - $188
-
lb
-
06 3.4111: Use closed cycle process to minimize waste water production $15,265 $1,500 $(-30.0)
(-1,172)
kWh
$(-17.0)
-
kW-mo/yr
- $15,312
-
Tgal
- -
07 4.114: Add/modify equipment to improve drying process $47,820 $68,000 $(-1,417.0)
(-61,547)
kWh
$(-3,037.0)
-
kW-mo/yr
$(-3,886.0)
-
MMBtu
- - $56,160
TOTAL RECOMMENDED $93,494 $129,910 $1,258
54,807
kWh
$(-477.0)
-
kW-mo/yr
$21,053
-
MMBtu
$15,312
-
Tgal
$188
-
lb
$56,160
TOTAL IMPLEMENTED $93,306 $129,610 $1,258
54,807
kWh
$(-477.0)
-
kW-mo/yr
$21,053
-
MMBtu
$15,312
-
Tgal
- $56,160
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs