| Assessment Year | 1999 |
|---|---|
| Principal Product | Recycled paper products |
| NAICS |
n/a
|
| SIC | 2621: Paper Mills |
| Sales Range | $50 M to 100M |
| # of Employees | 92 |
| Plant Area |
350,000
ft2
|
| Annual Production | 29,200,000
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $448,440 | 19,088,218 |
kWh
|
$0.023 |
| Electricity Demand | $497,808 | 31,126 |
kW-mo/yr
|
$15.99 |
| Electricity Fees | $4,105 | - |
|
- |
| Natural Gas | $478,481 | 132,995 |
MMBtu
|
$3.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $38,747 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,992 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4226: Use / purchase optimum sized compressor | $9,777 | $2,000 |
$5,331
226,846
kWh
|
$4,446
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $504 | $150 |
$282
11,430
kWh
|
$222
-
kW-mo/yr
|
- | |
| 03 | 2.1133: Adjust burners for efficient operation | $858 | $700 | - | - |
$858
-
MMBtu
|
|
| 04 | 2.2511: Insulate bare equipment | $1,535 | $1,006 | - | - |
$1,535
-
MMBtu
|
|
| 05 | 2.2437: Recover waste heat from equipment | $22,630 | $13,000 | - | - |
$22,630
-
MMBtu
|
|
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $3,443 | $3,520 |
$1,713
72,978
kWh
|
$1,730
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $38,747 | $20,376 |
$7,326
311,254
kWh
|
$6,398
-
kW-mo/yr
|
$25,023
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $23,992 | $13,850 |
$282
11,430
kWh
|
$222
-
kW-mo/yr
|
$23,488
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs