| Assessment Year | 1999 |
|---|---|
| Principal Product | |
| NAICS |
n/a
|
| SIC | 2011: Meat Packing Plants |
| Sales Range | $100 M to 500M |
| # of Employees | 500 |
| Plant Area |
150,000
ft2
|
| Annual Production | 100,000,000
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $515,222 | 21,930,833 |
kWh
|
$0.023 |
| Electricity Demand | $484,144 | 43,035 |
kW-mo/yr
|
$11.25 |
| Electricity Fees | $193,728 | - |
|
- |
| Fuel Oil #6 | $319,226 | 89,383 |
MMBtu
|
$3.57 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $226,924 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 4.111: Add equipment/ operators to reduce production bottleneck | $125,000 | $52,000 | - | - | - | - | - | $125,000 | |
| 02 | 2.1212: Operate boilers on high fire setting | $4,485 | - | - | - |
$4,485
-
MMBtu
|
- | - | - | |
| 03 | 2.2511: Insulate bare equipment | $636 | $476 | - | - |
$636
-
MMBtu
|
- | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $10,986 | $40 |
$10,986
467,761
kWh
|
- | - | - | - | - | |
| 05 | 2.2437: Recover waste heat from equipment | $71,741 | $40,000 | - | - |
$71,741
-
MMBtu
|
- | - | - | |
| 06 | 2.4154: Avoid rewinding motors more than twice | $10,026 | $25,900 |
$5,932
182,005
kWh
|
$4,094
-
kW-mo/yr
|
- | - | - | - | |
| 07 | 3.5313: Increase amount of waste recovered for resale | $188 | $300 | - | - | - |
$188
-
lb
|
- | - | |
| 08 | 3.4151: Minimize water usage | $2,627 | $2,500 | - | - |
$2,627
-
MMBtu
|
- | - | - | |
| 09 | 3.4151: Minimize water usage | $1,235 | $1,200 | - | - | - | - | $1,235 | - | |
| TOTAL RECOMMENDED | $226,924 | $122,416 |
$16,918
649,766
kWh
|
$4,094
-
kW-mo/yr
|
$79,489
-
MMBtu
|
$188
-
lb
|
$1,235 | $125,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs