ITAC Assessment: NC0172
ITAC logo
ITAC Assessment: NC0172
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 150,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $515,222 21,930,833
kWh
Electricity Demand $484,144 43,035
kW-mo/yr
Electricity Fees $193,728 -
Fuel Oil #6 $319,226 89,383
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $226,924 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Increase in Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $125,000 $52,000 - - - - - $125,000
02 2.1212: Operate boilers on high fire setting $4,485 - - - $4,485
-
MMBtu
- - -
03 2.2511: Insulate bare equipment $636 $476 - - $636
-
MMBtu
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $10,986 $40 $10,986
467,761
kWh
- - - - -
05 2.2437: Recover waste heat from equipment $71,741 $40,000 - - $71,741
-
MMBtu
- - -
06 2.4154: Avoid rewinding motors more than twice $10,026 $25,900 $5,932
182,005
kWh
$4,094
-
kW-mo/yr
- - - -
07 3.5313: Increase amount of waste recovered for resale $188 $300 - - - $188
-
lb
- -
08 3.4151: Minimize water usage $2,627 $2,500 - - $2,627
-
MMBtu
- - -
09 3.4151: Minimize water usage $1,235 $1,200 - - - - $1,235 -
TOTAL RECOMMENDED $226,924 $122,416 $16,918
649,766
kWh
$4,094
-
kW-mo/yr
$79,489
-
MMBtu
$188
-
lb
$1,235 $125,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs