ITAC Assessment: SD0537
ITAC logo
ITAC Assessment: SD0537
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product High Performance Catalysts and Resins, Research and Development
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 65,000
ft2
Annual Production 11,000
lb
Production Hrs. Annual 3,900
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $203,943 1,748,230
kWh
Electricity Demand $65,108 4,610
kW-mo/yr
Electricity Fees $63,626 -
Natural Gas $14,268 1,826
MMBtu
TOTAL YEARLY COSTS $346,945
RECOMMENDED SAVINGS* $78,797 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,718

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7232: Replace existing hvac unit with high efficiency model $23,109 $108,180 $16,290
139,589
kWh
$6,819
-
kW-mo/yr
-
02 2.7491: Insulate glazing, walls, ceilings, and roofs $21,873 $21,829 $18,258
156,455
kWh
$3,615
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $10,293 $10,000 - - $10,293
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $9,320 $22,960 $5,980
51,249
kWh
$3,340
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,406 $10,314 $4,387
37,588
kWh
$2,019
-
kW-mo/yr
-
06 2.7423: Reduce heat gain by window tinting $2,089 $7,880 $1,657
14,203
kWh
$432
-
kW-mo/yr
-
07 2.4131: Size electric motors for peak operating efficiency $1,758 $5,550 $1,281
10,982
kWh
$477
-
kW-mo/yr
-
08 2.7134: Use photocell controls $1,432 $4,070 $1,337
11,450
kWh
$95
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $1,312 $3,610 $1,312
11,240
kWh
- -
10 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $1,205 $2,550 $928
7,954
kWh
$277
-
kW-mo/yr
-
TOTAL RECOMMENDED $78,797 $196,943 $51,430
440,710
kWh
$17,074
-
kW-mo/yr
$10,293
TOTAL IMPLEMENTED $7,718 $13,924 $5,699
48,828
kWh
$2,019
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs