ITAC Assessment: NC0164
ITAC logo
ITAC Assessment: NC0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Textile processing chemicals
NAICS
n/a
SIC 2992: Lubricating Oils and Greases
Sales Range $50
M
to 100
M
# of Employees 162
Plant Area 150,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $169,875 3,397,714
kWh
Electricity Demand $82,921 10,153
kW-mo/yr
Natural Gas $191,395 38,680
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,015 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,997

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Water Consumption Savings
01 2.1133: Adjust burners for efficient operation $8,380 $700 - - $8,380
-
MMBtu
- -
02 2.4221: Install compressor air intakes in coolest locations $18 $1,345 $18
293
kWh
- - - -
03 2.7145: Install skylights $4,672 $35,090 $2,236
44,842
kWh
$2,436
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,553 $9,000 $2,082
41,618
kWh
$1,471
-
kW-mo/yr
- $1,000 -
05 3.4151: Minimize water usage $1,767 - - - $1,159
-
MMBtu
- $608
-
Tgal
06 3.6124: Burn waste oil for heat $40,650 $30,000 - - $40,650
-
MMBtu
- -
07 4.212: Adopt in-house material generation $1,975 $2,500 - - - - $1,975
-
Tgal
TOTAL RECOMMENDED $62,015 $78,635 $4,336
86,753
kWh
$3,907
-
kW-mo/yr
$50,189
-
MMBtu
$1,000 $2,583
-
Tgal
TOTAL IMPLEMENTED $61,997 $77,290 $4,318
86,460
kWh
$3,907
-
kW-mo/yr
$50,189
-
MMBtu
$1,000 $2,583
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs