ITAC Assessment: NC0119
ITAC logo
ITAC Assessment: NC0119
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Industrial sweepers
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 1,200,000
ft2
Annual Production 800
pieces
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,003 2,450,176
kWh
Electricity Demand $60,746 7,275
kW-mo/yr
Electricity Fees $8,766 -
Natural Gas $61,646 11,510
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $148,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,447

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.4322: Use or replace with energy efficient substitutes $2,540 $9,360 - - $2,540
-
MMBtu
- - - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $832 $180 $549
16,999
kWh
$283
-
kW-mo/yr
- - - - - - -
03 2.4323: Use optimum size and capacity equipment $1,719 $5,750 $1,719
67,995
kWh
- - - - - - - -
04 2.4226: Use / purchase optimum sized compressor $1,369 - $584
46,893
kWh
$785
-
kW-mo/yr
- - - - - - -
05 2.7243: Improve air circulation with destratification fans / other methods $6,047 $43,046 $(-211.0)
(-7,034)
kWh
$(-131.0)
-
kW-mo/yr
$6,389
-
MMBtu
- - - - - -
06 2.4322: Use or replace with energy efficient substitutes $14,220 $45,000 - - $5,470
-
MMBtu
- - $8,750 - - -
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $8,808 $39,078 $3,798
101,993
kWh
$5,010
-
kW-mo/yr
- - - - - - -
08 3.1192: Reduce scrap production $13,896 $15,000 - - - - - - $13,896 - -
09 3.1191: Change procedures / equipment / operating conditions $8,671 $26,025 - - - $7,684
-
gal
$987
-
lb
- - - -
10 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid $2,906 $6,000 $(-3.0)
(-293)
kWh
- - $800
-
gal
- $560 - $1,549 -
11 3.5315: Lease / purchase baler; sell cardboard to recycler $7,369 $5,200 - - - - $6,023
-
lb
$(-1,000.0) $2,346 - -
12 4.424: Improve space comfort conditioning $80,000 $200,000 - - - - - - - - $80,000
TOTAL RECOMMENDED $148,377 $394,639 $6,436
226,553
kWh
$5,947
-
kW-mo/yr
$14,399
-
MMBtu
$8,484
-
gal
$7,010
-
lb
$8,310 $16,242 $1,549 $80,000
TOTAL IMPLEMENTED $16,447 $20,930 $2,268
84,994
kWh
$283
-
kW-mo/yr
- - - - $13,896 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs