Assessment Year | 1997 |
---|---|
Principal Product | Industrial sweepers |
NAICS |
n/a
|
SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
1,200,000
ft2
|
Annual Production | 800
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $76,003 | 2,450,176 |
kWh
|
$0.031 |
Electricity Demand | $60,746 | 7,275 |
kW-mo/yr
|
$8.35 |
Electricity Fees | $8,766 | - |
|
- |
Natural Gas | $61,646 | 11,510 |
MMBtu
|
$5.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $148,377 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,447 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4322: Use or replace with energy efficient substitutes | $2,540 | $9,360 | - | - |
$2,540
-
MMBtu
|
- | - | - | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $832 | $180 |
$549
16,999
kWh
|
$283
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
03 | 2.4323: Use optimum size and capacity equipment | $1,719 | $5,750 |
$1,719
67,995
kWh
|
- | - | - | - | - | - | - | - | |
04 | 2.4226: Use / purchase optimum sized compressor | $1,369 | - |
$584
46,893
kWh
|
$785
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
05 | 2.7243: Improve air circulation with destratification fans / other methods | $6,047 | $43,046 |
$(-211.0)
(-7,034)
kWh
|
$(-131.0)
-
kW-mo/yr
|
$6,389
-
MMBtu
|
- | - | - | - | - | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $14,220 | $45,000 | - | - |
$5,470
-
MMBtu
|
- | - | $8,750 | - | - | - | |
07 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $8,808 | $39,078 |
$3,798
101,993
kWh
|
$5,010
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
08 | 3.1192: Reduce scrap production | $13,896 | $15,000 | - | - | - | - | - | - | $13,896 | - | - | |
09 | 3.1191: Change procedures / equipment / operating conditions | $8,671 | $26,025 | - | - | - |
$7,684
-
gal
|
$987
-
lb
|
- | - | - | - | |
10 | 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid | $2,906 | $6,000 |
$(-3.0)
(-293)
kWh
|
- | - |
$800
-
gal
|
- | $560 | - | $1,549 | - | |
11 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $7,369 | $5,200 | - | - | - | - |
$6,023
-
lb
|
$(-1,000.0) | $2,346 | - | - | |
12 | 4.424: Improve space comfort conditioning | $80,000 | $200,000 | - | - | - | - | - | - | - | - | $80,000 | |
TOTAL RECOMMENDED | $148,377 | $394,639 |
$6,436
226,553
kWh
|
$5,947
-
kW-mo/yr
|
$14,399
-
MMBtu
|
$8,484
-
gal
|
$7,010
-
lb
|
$8,310 | $16,242 | $1,549 | $80,000 | ||
TOTAL IMPLEMENTED | $16,447 | $20,930 |
$2,268
84,994
kWh
|
$283
-
kW-mo/yr
|
- | - | - | - | $13,896 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs