Assessment Year | 1997 |
---|---|
Principal Product | Industrial access equipment and ladders |
NAICS |
n/a
|
SIC | 3400: |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
127,422
ft2
|
Annual Production | 18,500,000
lb
|
Production Hrs. Annual | 2,626
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,744 | 1,282,532 |
kWh
|
$0.052 |
Electricity Demand | $17,594 | 4,630 |
kW-mo/yr
|
$3.80 |
Electricity Fees | $6,527 | - |
|
- |
Natural Gas | $21,894 | 2,842 |
MMBtu
|
$7.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $226,563 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $863 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $10,733 | $15,000 |
$8,380
160,903
kWh
|
$2,353
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
02 | 2.7244: Revise smoke cleanup from operations | $1,447 | $3,400 |
$(-284.0)
(-5,569)
kWh
|
$(-55.0)
-
kW-mo/yr
|
$1,786
-
MMBtu
|
- | - | - | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $252 | $240 |
$56
1,172
kWh
|
$196
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $863 | $210 |
$668
12,896
kWh
|
$195
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $226 | $1,400 |
$205
3,810
kWh
|
$21
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
06 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $831 | $500 | - | - | - |
$831
-
lb
|
- | - | - | - | - | |
07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $5,500 | $5,200 | - | - | - |
$3,200
-
lb
|
- | $3,300 | - | $(-1,000.0) | - | |
08 | 4.624: Hire additional personnel to reduce changeout time | $163,000 | $8,000 | - | - | - | - | - | - | - | - | $163,000 | |
09 | 4.431: Train operators for maximum operating efficiency | $11,000 | $10,500 | - | - | - | - | $(-14,000.0) | - | - | - | $25,000 | |
10 | 4.322: Eliminate old stock and modify inventory control | $32,711 | $56,000 | - | - | - | - | $(-42,000.0) | - | $24,711 | - | $50,000 | |
TOTAL RECOMMENDED | $226,563 | $100,450 |
$9,025
173,212
kWh
|
$2,710
-
kW-mo/yr
|
$1,786
-
MMBtu
|
$4,031
-
lb
|
$(-56,000.0) | $3,300 | $24,711 | $(-1,000.0) | $238,000 | ||
TOTAL IMPLEMENTED | $863 | $210 |
$668
12,896
kWh
|
$195
-
kW-mo/yr
|
- | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs