| Assessment Year | 1997 |
|---|---|
| Principal Product | Metal cases |
| NAICS |
n/a
|
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
180,000
ft2
|
| Annual Production | 1,023,734
lb
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $156,523 | 4,754,689 |
kWh
|
$0.033 |
| Electricity Demand | $165,854 | 14,473 |
kW-mo/yr
|
$11.46 |
| Electricity Fees | $19,951 | - |
|
- |
| Natural Gas | $144,443 | 32,732 |
MMBtu
|
$4.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $163,530 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $136,934 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7135: Install occupancy sensors | $659 | $250 |
$659
20,223
kWh
|
- | - | - | - | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $405 | $1,680 |
$194
5,862
kWh
|
$91
-
kW-mo/yr
|
- | - | - | - | $120 | |
| 03 | 2.4226: Use / purchase optimum sized compressor | $9,625 | $8,500 |
$1,690
51,583
kWh
|
$7,935
-
kW-mo/yr
|
- | - | - | - | - | |
| 04 | 2.2428: Use flue gases in radiant heater for space heating, ovens, etc | $12,532 | $6,000 | - | - |
$12,532
-
MMBtu
|
- | - | - | - | |
| 05 | 2.3191: Use demand controller or load shedder | $3,780 | $10,000 | - |
$3,780
-
kW-mo/yr
|
- | - | - | - | - | |
| 06 | 3.2121: Convert to electrostatic powder coating | $3,380 | $1,000 | - | - | - | - | - |
$3,380
-
lb
|
- | |
| 07 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $102,104 | $5,000 | - | - | - |
$102,104
-
gal
|
- | - | - | |
| 08 | 3.1192: Reduce scrap production | $31,045 | $15,000 | - | - | - | - |
$31,045
-
lb
|
- | - | |
| TOTAL RECOMMENDED | $163,530 | $47,430 |
$2,543
77,668
kWh
|
$11,806
-
kW-mo/yr
|
$12,532
-
MMBtu
|
$102,104
-
gal
|
$31,045
-
lb
|
$3,380
-
lb
|
$120 | ||
| TOTAL IMPLEMENTED | $136,934 | $22,680 |
$194
5,862
kWh
|
$91
-
kW-mo/yr
|
- |
$102,104
-
gal
|
$31,045
-
lb
|
$3,380
-
lb
|
$120 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs