ITAC Assessment: NC0097
ITAC logo
ITAC Assessment: NC0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 120,000
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,829 1,092,321
kWh
Electricity Demand $27,545 3,299
kW-mo/yr
Electricity Fees $2,551 -
Natural Gas $27,996 5,197
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,763 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,021 $2,451 $1,744
53,048
kWh
$1,277
-
kW-mo/yr
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $138 $700 $65
2,052
kWh
$23
-
kW-mo/yr
- - - - $50
03 2.4133: Use most efficient type of electric motors $469 $772 $286
8,792
kWh
$183
-
kW-mo/yr
- - - - -
04 2.4221: Install compressor air intakes in coolest locations $486 $245 $302
9,086
kWh
$184
-
kW-mo/yr
- - - - -
05 2.7313: Recycle air for heating, ventilation and air conditioning $11,779 $11,650 - - $11,779
-
MMBtu
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $488 $210 $303
9,086
kWh
$185
-
kW-mo/yr
- - - - -
07 3.5313: Increase amount of waste recovered for resale $657 $100 - - - $657
-
lb
- - -
08 4.444: Install system to collect scrap $20,250 $1,000 - - - - $20,250 - -
09 4.511: Expand operations into unused space $13,475 - $745
22,860
kWh
$451
-
kW-mo/yr
$1,011
-
MMBtu
- - $11,268 -
TOTAL RECOMMENDED $50,763 $17,128 $3,445
104,924
kWh
$2,303
-
kW-mo/yr
$12,790
-
MMBtu
$657
-
lb
$20,250 $11,268 $50
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs