Assessment Year | 1996 |
---|---|
Principal Product | Electric soldering tools |
NAICS |
n/a
|
SIC | 3690: |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
169,000
ft2
|
Annual Production | 2,300,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $250,725 | 6,913,834 |
kWh
|
$0.036 |
Electricity Demand | $155,963 | 14,441 |
kW-mo/yr
|
$10.80 |
Natural Gas | $15,120 | 3,502 |
MMBtu
|
$4.32 |
Fuel Oil #2 | $4,170 | 687 |
MMBtu
|
$6.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $106,467 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,709 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $68,531 | $132,000 |
$63,563
1,752,638
kWh
|
$37,260
-
kW-mo/yr
|
$(-32,292.0)
-
MMBtu
|
- | - | |
02 | 2.2511: Insulate bare equipment | $946 | $1,155 |
$653
17,878
kWh
|
$389
-
kW-mo/yr
|
$(-96.0)
-
MMBtu
|
- | - | |
03 | 2.2515: Use optimum thickness insulation | $368 | $195 |
$254
7,034
kWh
|
$151
-
kW-mo/yr
|
$(-37.0)
-
MMBtu
|
- | - | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $3,668 | $6,000 |
$3,668
101,114
kWh
|
- | - | - | - | |
05 | 2.2443: Re-use or recycle hot or cold process exhaust air | $18,922 | $56,200 |
$2,923
80,598
kWh
|
$2,979
-
kW-mo/yr
|
$13,020
-
MMBtu
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,524 | $28,500 |
$9,524
262,603
kWh
|
- | - | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $802 | $420 |
$434
12,016
kWh
|
$368
-
kW-mo/yr
|
- | - | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $884 | $600 |
$554
15,240
kWh
|
$330
-
kW-mo/yr
|
- | - | - | |
09 | 2.7135: Install occupancy sensors | $1,412 | $500 |
$853
23,447
kWh
|
$559
-
kW-mo/yr
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $199 | $168 |
$45
1,172
kWh
|
$22
-
kW-mo/yr
|
- | - | $132 | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $246 | $980 |
$125
3,517
kWh
|
$51
-
kW-mo/yr
|
- | - | $70 | |
12 | 2.4133: Use most efficient type of electric motors | $909 | $761 |
$569
15,826
kWh
|
$340
-
kW-mo/yr
|
- | - | - | |
13 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $56 | $100 | - | - | - |
$56
-
lb
|
- | |
TOTAL RECOMMENDED | $106,467 | $227,579 |
$83,165
2,293,083
kWh
|
$42,449
-
kW-mo/yr
|
$(-19,405.0)
-
MMBtu
|
$56
-
lb
|
$202 | ||
TOTAL IMPLEMENTED | $6,709 | $9,596 |
$5,569
153,575
kWh
|
$1,110
-
kW-mo/yr
|
$(-96.0)
-
MMBtu
|
$56
-
lb
|
$70 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs