| Assessment Year | 1990 |
|---|---|
| Principal Product | TURBINE BLADES & DISKS |
| NAICS |
n/a
|
| SIC | 3724: Aircraft Engines and Engine Parts |
| Sales Range | $10 M to 50M |
| # of Employees | 170 |
| Plant Area |
n/a
|
| Annual Production | 378,000
pieces
|
| Production Hrs. Annual | 8,520
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $306,408 | 4,932,005 |
kWh
|
$0.062 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $67,746 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $30,030 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $2,166 | $3,217 |
$2,166
34,877
kWh
|
|
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $11,178 | - |
$11,178
179,953
kWh
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,719 | $1,000 |
$9,719
156,506
kWh
|
|
| 04 | 2.4239: Eliminate or reduce compressed air usage | $5,450 | $1,200 |
$5,450
87,632
kWh
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,966 | $100 |
$1,966
31,653
kWh
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,623 | $1,058 |
$4,623
74,443
kWh
|
|
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,544 | $2,708 |
$2,544
41,032
kWh
|
|
| 08 | 2.7422: Plant trees or shrubs near windows to shield from sunlight | $7,935 | $5,300 |
$7,935
127,784
kWh
|
|
| 09 | 2.8114: Change rate schedules or other changes in utility service | $22,165 | $30,000 |
$22,165
-
kWh
|
|
| TOTAL RECOMMENDED | $67,746 | $44,583 |
$67,746
733,880
kWh
|
||
| TOTAL IMPLEMENTED | $30,030 | $4,866 |
$30,030
483,587
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs