ITAC Assessment: AM0120
ITAC logo
ITAC Assessment: AM0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product AIRCRAFT GROUND POWER
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 400
pieces
Production Hrs. Annual 2,780
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,867 1,640,680
kWh
Natural Gas $13,043 2,644
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,336 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,000 - $6,800
87,925
kWh
$1,200
02 2.6218: Turn off equipment when not in use $7,950 $215 $7,950
167,057
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,506 - $753
9,965
kWh
$753
04 2.6232: Install set-back timers $1,250 - $1,250
26,377
kWh
-
05 2.4133: Use most efficient type of electric motors $1,050 $1,960 $1,050
-
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $650 $680 $650
13,775
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $640 $50 $640
13,482
kWh
-
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $290 $350 $290
6,155
kWh
-
TOTAL RECOMMENDED $21,336 $3,255 $19,383
324,736
kWh
$1,953
TOTAL IMPLEMENTED - - - -