ITAC Assessment: DL0156
ITAC logo
ITAC Assessment: DL0156
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Waste Water Treatment
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 30
Plant Area 290,000
ft2
Annual Production 3,630,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $383,375 4,931,878
kWh
Electricity Demand $35,669 11,581
kW-mo/yr
Electricity Fees $1,594 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,680 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6231: Utilize controls to operate equipment only when needed $5,830 $940 $5,530
70,910
kWh
$300
-
kW-mo/yr
02 2.6231: Utilize controls to operate equipment only when needed $42,210 $37,500 $40,050
513,400
kWh
$2,160
-
kW-mo/yr
03 2.6231: Utilize controls to operate equipment only when needed $3,350 $3,000 $3,350
42,950
kWh
-
04 2.6231: Utilize controls to operate equipment only when needed $3,140 $3,000 $3,140
40,200
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,590 $2,950 $1,510
19,325
kWh
$80
-
kW-mo/yr
06 2.4311: Recover mechanical energy $7,880 $20,000 $7,480
95,950
kWh
$400
-
kW-mo/yr
07 2.1336: Install equipment to utilize waste fuel $19,680 $217,600 $19,680
252,270
kWh
-
TOTAL RECOMMENDED $83,680 $284,990 $80,740
1,035,005
kWh
$2,940
-
kW-mo/yr
TOTAL IMPLEMENTED $43,800 $40,450 $41,560
532,725
kWh
$2,240
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs