Assessment Year | 2015 |
---|---|
Principal Product | Waste Water Treatment |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 30 |
Plant Area |
290,000
ft2
|
Annual Production | 3,630,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $383,375 | 4,931,878 |
kWh
|
$0.078 |
Electricity Demand | $35,669 | 11,581 |
kW-mo/yr
|
$3.08 |
Electricity Fees | $1,594 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,800 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6231: Utilize controls to operate equipment only when needed | $5,830 | $940 |
$5,530
70,910
kWh
|
$300
-
kW-mo/yr
|
|
02 | 2.6231: Utilize controls to operate equipment only when needed | $42,210 | $37,500 |
$40,050
513,400
kWh
|
$2,160
-
kW-mo/yr
|
|
03 | 2.6231: Utilize controls to operate equipment only when needed | $3,350 | $3,000 |
$3,350
42,950
kWh
|
- | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $3,140 | $3,000 |
$3,140
40,200
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,590 | $2,950 |
$1,510
19,325
kWh
|
$80
-
kW-mo/yr
|
|
06 | 2.4311: Recover mechanical energy | $7,880 | $20,000 |
$7,480
95,950
kWh
|
$400
-
kW-mo/yr
|
|
07 | 2.1336: Install equipment to utilize waste fuel | $19,680 | $217,600 |
$19,680
252,270
kWh
|
- | |
TOTAL RECOMMENDED | $83,680 | $284,990 |
$80,740
1,035,005
kWh
|
$2,940
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $43,800 | $40,450 |
$41,560
532,725
kWh
|
$2,240
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs