ITAC Assessment: SD0031
ITAC logo
ITAC Assessment: SD0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ELECTRONIC TEST EQUIPMENT
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 131
Plant Area
n/a
Annual Production 10,400
pieces
Production Hrs. Annual 2,975
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,875 1,688,453
kWh
Natural Gas $1,460 220
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,075 $6,000 $1,559
16,999
kWh
$(-484.0)
-
MMBtu
02 2.7492: Use proper thickness of insulation on building envelope $67 $115 $67
586
kWh
-
TOTAL RECOMMENDED $1,142 $6,115 $1,626
17,585
kWh
$(-484.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs