Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Pharmaceutical rubber items
NAICS
n/a
SIC 3060:
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 140,406
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $476,087 12,665,592
kWh
Electricity Demand $387,453 26,783
kW-mo/yr
Natural Gas $158,893 42,777
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,401

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,895 $10,000 $8,321
221,278
kWh
$12,574
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,441 $3,000 $1,441
38,394
kWh
- - -
03 2.4239: Eliminate or reduce compressed air usage $9,833 $400 $3,835
101,993
kWh
$5,998
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $1,498 $1,700 $602
16,120
kWh
$896
-
kW-mo/yr
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,744 $600 - - $1,744
-
MMBtu
-
06 2.2614: Use cooling tower or economizer to replace chiller cooling $6,221 $5,100 $3,046
80,891
kWh
$3,175
-
kW-mo/yr
- -
07 2.7111: Reduce illumination to minimum necessary levels $2,284 $640 $553
14,654
kWh
$1,731
-
kW-mo/yr
- -
08 2.4133: Use most efficient type of electric motors $3,827 $2,970 $1,874
49,824
kWh
$1,953
-
kW-mo/yr
- -
09 2.2511: Insulate bare equipment $932 $549 - $510
-
kW-mo/yr
$422
-
MMBtu
-
10 2.7425: Clean or color roof to reduce solar load $3,582 $4,720 $1,425
37,808
kWh
$2,157
-
kW-mo/yr
- -
11 2.3191: Use demand controller or load shedder $1,960 $2,000 - $1,960
-
kW-mo/yr
- -
12 2.2612: Use cooling tower water instead of refrigeration $25,015 $18,000 $25,015
655,334
kWh
- - -
13 3.1191: Change procedures / equipment / operating conditions $20,000 $2,000 - - - $20,000
-
lb
TOTAL RECOMMENDED $99,232 $51,679 $46,112
1,216,296
kWh
$30,954
-
kW-mo/yr
$2,166
-
MMBtu
$20,000
-
lb
TOTAL IMPLEMENTED $65,401 $38,619 $41,088
1,082,943
kWh
$23,891
-
kW-mo/yr
$422
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs