Assessment Year | 1996 |
---|---|
Principal Product | Pickled Cucumbers |
NAICS |
n/a
|
SIC | 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
200,000
ft2
|
Annual Production | 7,500,000
units
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $261,443 | 7,924,678 |
kWh
|
$0.033 |
Electricity Demand | $141,690 | 16,761 |
kW-mo/yr
|
$8.45 |
Fuel Oil #6 | $179,894 | 56,414 |
MMBtu
|
$3.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $70,201 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,289 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,850 | $1,578 |
$1,091
33,118
kWh
|
$759
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $108 | $560 |
$50
1,465
kWh
|
$18
-
kW-mo/yr
|
- | - | $40 | |
03 | 2.7134: Use photocell controls | $2,242 | $660 |
$1,014
30,774
kWh
|
$1,228
-
kW-mo/yr
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $859 | $30 |
$535
16,120
kWh
|
$324
-
kW-mo/yr
|
- | - | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $605 | $600 |
$162
4,982
kWh
|
$443
-
kW-mo/yr
|
- | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $2,187 | $3,224 |
$1,640
49,824
kWh
|
$547
-
kW-mo/yr
|
- | - | - | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,902 | $600 | - | - |
$1,902
-
MMBtu
|
- | - | |
08 | 3.4111: Use closed cycle process to minimize waste water production | $1,683 | $2,500 |
$(-205.0)
(-6,155)
kWh
|
$(-250.0)
-
kW-mo/yr
|
- |
$2,138
-
Tgal
|
- | |
09 | 3.4114: Replace city water with recycled water via cooling tower | $58,765 | $10,360 |
$(-1,034.0)
(-31,360)
kWh
|
$(-393.0)
-
kW-mo/yr
|
- |
$60,192
-
Tgal
|
- | |
TOTAL RECOMMENDED | $70,201 | $20,112 |
$3,253
98,768
kWh
|
$2,676
-
kW-mo/yr
|
$1,902
-
MMBtu
|
$62,330
-
Tgal
|
$40 | ||
TOTAL IMPLEMENTED | $8,289 | $6,622 |
$3,795
115,181
kWh
|
$2,552
-
kW-mo/yr
|
$1,902
-
MMBtu
|
- | $40 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs