ITAC Assessment: NC0075
ITAC logo
ITAC Assessment: NC0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Milk and Ice Cream
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 52
Plant Area 60,000
ft2
Annual Production 12,500
Tgal
Production Hrs. Annual 3,200
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $479,852 5,848,183
kWh
Natural Gas $61,000 10,683
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,718 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,236

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,682 $546 $4,682
74,150
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,267 $1,710 $2,267
19,050
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $482 $1,680 $482
5,862
kWh
04 2.2624: Use cold waste water to cool chiller feed water $5,067 $8,000 $5,067
59,789
kWh
05 2.3192: Use fossil fuel powered generator during peak demand periods $72,500 $170,000 $72,500
-
kWh
06 2.4221: Install compressor air intakes in coolest locations $720 $200 $720
6,155
kWh
TOTAL RECOMMENDED $85,718 $182,136 $85,718
165,006
kWh
TOTAL IMPLEMENTED $85,236 $180,456 $85,236
159,144
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs