ITAC Assessment: MS0101
ITAC logo
ITAC Assessment: MS0101
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Men's Coats
NAICS
n/a
SIC 2329: Men's and Boys' Clothing, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 214
Plant Area 42,000
ft2
Annual Production 225,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,520 1,235,346
kWh
Electricity Demand $28,497 6,012
kW-mo/yr
Electricity Fees $20,674 -
Natural Gas $24,025 4,201
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,123

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7241: Install outside air damper / economizer on hvac unit $1,713 $5,100 $1,073
40,739
kWh
$640 - - - - -
02 2.2442: Preheat combustion air with waste heat $1,593 $4,400 - - $1,593
-
MMBtu
- - - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,386 $1,000 - - $1,386
-
MMBtu
- - - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $2,750 - - - - $1,950
-
lb
- - $800
05 3.1191: Change procedures / equipment / operating conditions $2,012 $816 - - - $10
-
lb
- - $2,002
06 4.652: Replace existing equipment with more suitable substitutes $7,360 $420 - - - - $7,360 - -
07 4.821: Pay bills on time to avoid late fees $207 - - - - - - $207 -
08 2.8112: Combine utility meters $420 $1,225 - - - - - $420 -
TOTAL RECOMMENDED $17,441 $12,961 $1,073
40,739
kWh
$640 $2,979
-
MMBtu
$1,960
-
lb
$7,360 $627 $2,802
TOTAL IMPLEMENTED $12,123 $2,645 - - $1,386
-
MMBtu
$1,950
-
lb
$7,360 $627 $800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs